Services/Cloud Computing
03

CLOUD
COMPUTING.

Multi-cloud migrations, hybrid infrastructure design, and FinOps optimization across AWS, Azure, and GCP. Move to cloud without the cost overruns or security gaps.

AWSAzureGCPFinOpsHybridMulti-Cloud
38%
Avg. cloud cost reduction
3
Major cloud platforms supported
0
Data loss incidents on migration
12 wks
Typical full migration timeline

HOW WE MOVE YOU
TO THE CLOUD.

Manufacturing & Ops

Lift-and-Shift Cloud Migration

Migrate on-premises workloads to AWS, Azure, or GCP with zero data loss and minimal downtime. Includes pre-migration assessment, dependency mapping, and cutover planning.

AWSAzureGCPMigration
Financial Services

Hybrid Infrastructure Design

Architect hybrid environments connecting on-premises data centers to cloud VPCs via private peering — keeping sensitive workloads on-prem while leveraging cloud elasticity.

Hybrid CloudVPC PeeringExpressRoute
SaaS & Tech

FinOps Cost Optimization

Identify and eliminate cloud waste through right-sizing, reserved instance planning, and automated shutdown policies. Average client saves 28–40% on monthly cloud spend.

FinOpsRight-SizingCost Reduction
E-Commerce & Retail

Multi-Cloud Resilience

Distribute workloads across two or more cloud providers to eliminate single-vendor dependency. Active-active configurations with global load balancing and automated failover.

Multi-CloudActive-ActiveGlobal LB

FRAMEWORKS WE
ALIGN TO.

SOC 2 Type IITrust Services

Cloud environment controls for availability, confidentiality, and security — IAM policies, encryption, logging, and change management aligned to TSC criteria.

CC6.1 – Logical Access
CC7.1 – Threat Detection
A1.1 – Availability
ISO 270012022

Cloud asset management, access control, and cryptography controls mapped to Annex A — supporting certification readiness for cloud-hosted environments.

A.8 – Asset Management
A.9 – Access Control
A.10 – Cryptography
NIST CSF2.0

Cloud-specific protect and detect functions — identity management, data security, and continuous monitoring across multi-cloud environments.

PR.AC – Identity Management
PR.DS – Data Security
DE.CM – Monitoring
FedRAMPRev. 5

Federal cloud security baseline — applicable for clients with government contracts requiring cloud services to meet NIST SP 800-53 control families.

AC – Access Control
AU – Audit & Accountability
SC – System Communications

12-WEEK MIGRATION
TIMELINE.

Phase 1 · Week 1–2

Cloud Readiness Assessment

01

Inventory of all workloads, dependency mapping, TCO analysis comparing on-prem vs. cloud costs, and identification of migration waves by complexity and risk.

Deliverables
Workload inventory
TCO comparison report
Migration wave plan
Phase 2 · Week 3–4

Landing Zone & Architecture

02

Cloud landing zone setup with account structure, VPC design, IAM policies, logging, and security baselines — before any workload migration begins.

Deliverables
Landing zone configuration
IAM & security baseline
Network architecture doc
Phase 3 · Week 5–10

Phased Migration Execution

03

Wave-based migration starting with dev/test workloads, progressing to production. Each wave includes pre-migration testing, cutover, and post-migration validation.

Deliverables
Per-wave migration reports
Performance benchmarks
Rollback procedures
Phase 4 · Week 11–12

FinOps & Optimization

04

Post-migration cost review, right-sizing recommendations, reserved instance purchasing guidance, and tagging policy implementation for ongoing cost visibility.

Deliverables
FinOps baseline report
Right-sizing recommendations
Tagging & governance policy

Move to cloud without the cost overruns.

Get a free cloud readiness assessment and TCO analysis from our certified cloud architects.